ClinicPics_Randall

EpoxyRepairComboClamp1_33 EpoxyRepairComboClamp2_32 EpoxyRepairComboClamp3_34 HoistStacking_21
Repairing a complex break…. Clamping the first few pieces.
Repairing a complex break…. Clamping the last few pieces.
Repairing a complex break…. The epoxy dries quickly.
There is no substitute for leverage, as demonstrated in this final stage of straightening this stacked grave marker.
HoistStackLeveling_06 MiniStack_Begin_67 MiniStack_BeginParts_66 MiniStackBaseBegin_65
There is no substitute for leverage, as demonstrated in this initial stage of straightening this stacked grave marker. Moving the base allows for a good sub-base of sand and pea gravel that should keep the grave marker properly aligned for years.
Surveying the toppled, small, stacked marker.
Surveying the pieces.
Leveling the base.

<<  Index page 1 2 3 4 5 6 7 8 9 10  >>


Click on a picture to enlarge it.

Generated by Galerie